4-1-13 We just started to build with Wayne Homes. We are building the Montgomery.

Saturday, May 4, 2013

4-29-13 FIRST DAY OF FRAMING

THEY STARTED ON 4-29-13 AND GOT ALOT DONE FOR ONE DAY.  THEY PUT UP ALL THE BASEMENT WALLS AND THE FIRST FLOOR DECKING.  MOVING RIGHT ALONG. 
4-29 OUTSIDE WALLS

BASEMENT WALLS

FIRST FLOOR

FIRST FLOOR
Posted by T.H. at 6:27 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2013 (45)
    • ►  December (4)
    • ►  October (3)
    • ►  August (5)
    • ►  July (11)
    • ►  June (5)
    • ▼  May (17)
      • 5-30-13 STARTED TO HANG DRYWALL
      • 5-24-13 INSULATION
      • 5-24-13 START OF THE SIDING
      • 5-14th, 15th, 16th ELECTRIC AND BASEMENT
      • 5-8-13 FRAMERS AND PLANT LEDGES
      • 5-10-13 ROUGH PLUMBING AND CONCRETE
      • 5-7-13 WINDOWS AND ROOF
      • 5-6-13 RAIN DAY
      • 5-4-13 UP TO DATE NOW!
      • 5-2-13 INSIDE FRAMING
      • 5-2-13 WOW
      • 5-1-13 DAY 2 OF FRAMING
      • 4-30-13 WALLS
      • 4-29-13 FIRST DAY OF FRAMING
      • 4-26-13 LUMBER DELIVERED
      • 4-18TH & 19TH - WATERPROOF AND BACK FILL
      • 4-1-13 DIG DAY, FOOTERS, AND BLOCK