Wednesday, June 19, 2013

JUNE 18TH - STARTED ON TRIM AND CABINETS

They started on the trim and cabinets today.  They had a crew and was moving right along.  We got out of their way but made sure we stopped back out that evening.  Wow, all the doors were hung (they stain the doors after they are hung) and trim was in place.  The kitchen and bath cabinets were installed and the counter tops in place.  It is nice to see it with some character now and not the blank walls. They did a great job matching the trim with the cabinets.
LOVE THE CLOSET DOORS
BEDROOM # 2

GREATROOM

BEDROOM # 3

KITCHEN CABNETS :)


KIDS BATHROOM

MASTER BATHROOM
DOUBLE SINKS

No comments:

Post a Comment