Today the closet shelving was installed in all the rooms and the one bedroom closet door was installed to swing into the room. The bathroom mirrors are up.
We went through the house and marked all the little things in the drywall that needed touched up. Flooring should start tomorrow. I'm getting excited :).
The septic had to be put on hold because they had an emergency but should be completed on Saturday and inspected on Monday.
Was told that flooring would start tomorrow and will finish up on Friday.